FAQs
More FAQs- Will applying acrylic void my manufacturer’s warranty on the floor?
- Are there instructions to follow after my hard-surface floors are cleaned?
- How long will it take to have my floors coated with acrylic?
It may. However, most factory warranties do not cover scratching, wear and abrasion. If your floor has reached this stage, your best option is to protect it. Many factory finishes, like acrylic, will eventually wear out. You can most closely achieve that factory finish by applying a thin coat of acrylic. Refer to the manufacturer’s warranty.
Before you walk on your floors, it’s best to allow a minimum drying time of at least 1 hour. We recommend allowing 24 hours before walking on it with heavy traffic. Be cautious and protect floors from getting wet for 24 hours after application of either finish as it is not thoroughly cured yet. You can return furniture to your floors (with suggested use of felt pads) after 12 hours and return rugs to floors after 12 hours.
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. When applying an acrylic finish, stripping of the old finish is usually necessary. When that’s the case, finish removal plus the application of 3 coats of finish requires 1 hour for every 150 square feet of flooring. Generally, 3 coats of finish are required to achieve the desired effect. If a floor does not require stripping, it can generally be shower scrubbed which is a procedure used for preparing a floor for receiving a new layer of finish. Once that has taken place, a floor can be recoated at anywhere from 4,000 to 6,000 square feet per hour.